This layout is a loose representation of the most mountainous portion of the Seaboard Air Line from Atlanta to Birmingham in the late summer of 1954. It is designed for lots of industry switching and has a number of seriously modified kits and scratch-built structures. The track is a combination of flex track and handlaid industrial sidings. Locomotive power is provided by first generation diesels – with some ‘retired’ SAL steam on the industrial switching area in Rockmart.
The layout is a new one (replacing a similar layout at a different location, last on tour in 2018), but it is fully functional. Fascia and backdrops have been installed, and scenery work is in progress.
The physical plant is controlled via a C/MRI system, with propulsion via EasyDCC. Since this current rendition of the layout is less than 6 years old, the automated signal system is fully functional via JMRI.
Scale / Gauge
HO
Size of Layout
35x35 (L shape)
Prototype
Seaboard Air Line
Location Modeled
Between Atlanta and Birmingham
Era
Fall 1954
Style of Track Plan
Point-to-Point
Length of Main Line
170'
Layout Height
46"
Benchwork
Open Grid
Roadbed Material
Other
Track Manufacturer
Peco
Turnouts
Peco
Minimum Main Line Radius
30"
Maximum Grade
0 %
Scenery Techniques
Plaster on cardboard web - using hydrocal and towels - sculptamold, sanded grout, joint compound for soil. Ground foam and anything else handy for texture.
% Scenery Complete
35 %
Backdrop
Painted Masonite
Control System
DCC - other
Car Forwarding System
Other
Train Authority / Dispatching
CTC
Operating Group
Intown Atlanta Model Railroaders
Direction Comment
Proceed around the right side of the house, follow path to basement door. PLEASE DO NOT PARK ON THE GRASS. Sprinkler heads are very close to the concrete curb and are easily damaged.
Piedmont Division will be undergoing monthly scheduled maintenance on August 3rd, beginning at 10PM EST. The website will be unavailable during this time. We apologize for any inconvenience.
Implementation in Progress
This function is currently being implemented. Thank you for your patience.
Encountering Issues?
As you explore the site and get familiar with how it works, we’ve setup a form to report any bugs or issues that you may encounter. Using this form will help us track and address issues more efficiently.
Thank you for your time, your feedback is invaluable and appreciated!